This two-piece replacement set is supplied to stabilise front and rear CVD drive shaft joints on TRAXXAS Slash 4x4 platforms. The pack mirrors the original screw-pin arrangement used in the Slash F/R CVD yoke and is intended as a direct service replacement.
Functionally, the pins keep axial and rotational position inside the CVD assembly to reduce end play and maintain consistent driveshaft engagement under load. Fit them when original pins are worn, bent, or allow excess movement that impairs driveline reliability.
Installation follows standard CVD service steps: remove the CVD assembly, replace the affected pin with the provided item, then reassemble using the vehicle's factory fastening method. The component is designed for direct fitment to the Slash F/R CVD interfaces referenced in the product title.
Technical note: these pins are intended to improve location accuracy and reliability of the driveline; they do not alter gear ratios or motor output but help maintain repeatable power transfer during high-load operation.